uttar pradesh
- supply of 1.5 ton splite ac, 1 phase ac, 5 star, cooling capacity 4500 kacl/hour with 3 mtr length copper pipe, compressor warranty 10 years complete. with all accessories conforming to is no 1391 or latest including installation and commissioning.
- Deadline : 08 May 2026
- Updated : 25 Apr 2026
- Value : See Document
andhra pradesh
- renewal of auxiliary system pipelines from surya and matsya docks to north drydock (ndd) pump house with 300 mm dia ss 316 pipelines, with connected valves and dismantling joints and associated accessories at drydocks at naval dockyard visakhapatnam
- Deadline : 20 May 2026
- Updated : 23 Apr 2026
- Value : 85.68 Lac
andhra pradesh
- repair/replacement of hydraulic and lubrication pipelines in ccd/sms-1
- Deadline : 29 Apr 2026
- Updated : 22 Apr 2026
- Value : 26.61 Lac
rajasthan
- supply of clamp assembly for 1 1/4 pipe.
- Deadline : 11 May 2026
- Updated : 21 Apr 2026
- Value : See Document
assam
- supply of three phase 1.2 hp monoblock pump 430 volt with 3 mtr length flexible suction pipe, foot valve and connected accessories as specified and directed incl tasting and comminssining.
- Deadline : 29 Apr 2026
- Updated : 20 Apr 2026
- Value : See Document
assam
- supply of three phase 1.2 hp monoblock pump 430 volt incl 3 mtr length flexible suction pipe, foot valve and accessories all as specified and directed incl tasting and comminssining
- Deadline : 29 Apr 2026
- Updated : 20 Apr 2026
- Value : See Document
assam
- supply of three phase 1.2 hp monoblock pump 430 volt complete with 3 mtr length required size flexible suction pipe, foot valve and with accessories incl tasting and comminssining
- Deadline : 29 Apr 2026
- Updated : 20 Apr 2026
- Value : See Document
andhra pradesh
- supply and delivery of 4 sq 3 core copper cable wire and drivers, pcbs and clamp sets, gi pipes and cable for the street light maintenance in the limits of pulivendula municipality
- Deadline : 27 Apr 2026
- Updated : 20 Apr 2026
- Value : 4.20 Lac
andhra pradesh
- supply of holding clamp assembly for copper pipe.
- Deadline : 01 May 2026
- Updated : 20 Apr 2026
- Value : See Document
uttar pradesh
- supply of pp clamp for ss pipe
- Deadline : 09 Jun 2026
- Updated : 20 Apr 2026
- Value : See Document
Subscribe / Membership
