orissa , hemgir
- construction of 17.5 mty chp on preengineered turnkeybasis for design,supply,erection commissioning,trialrun testing,oandm during dlp for coal evacuation(12.5 mty) from kg mines by pipe/trough conveyor sardega chp (u/c) construction of 5 mty atls at kgocp
- engineering, plants and machinery
- Deadline : 18 Jan 2025
- Updated : 23 Nov 2024
- Value : 533.73 Crores
orissa , hemgir
- construction of 17.5 mty chp on preengineered turnkeybasis for design,supply,erection commissioning,trialrun testing,oandm during dlp for coal evacuation(12.5 mty) from kg mines by pipe/trough conveyor sardega chp (u/c) construction of 5 mty atls at kgocp
- engineering, plants and machinery
- Deadline : 18 Jan 2025
- Updated : 23 Nov 2024
- Value : 533.73 Crores
- 1